|
jgg
2008 28 (1):
114-117
ISSN: 0412-1961 CN: 21-1139/TG
|
|
|
|
|
|
|
DATA PROCESSING IN PRECISION SURVEYING OF BALLASTLESS TRACK HIGH-SPEED RAILWAY |
Cai Shiyi 1) ;Li Bofeng 1) ;Shi Debin 2) ;Liu Cheng 2) ; and Shen Yunzhong 1,3) |
1)Department of Surveying and Geoinformatics, Tongji University, Shanghai 2000922Dept. of Remote Sensing and Surveying and Mapping of the Third Surveying and Design Institute Ltd. Co., Tianjin 3002513)Key Laboratory of Advanced Surveying Engineering,SBSM, Shanghai 200092 |
Received: 1900-01-01 Revised: 1900-01-01 Online: null |
Supporting info null |
|
|