|
jgg
2010 30 (Supp.2):
86-89
ISSN: 0412-1961 CN: 21-1139/TG
|
|
|
|
|
|
|
SUMMARY OF ASEISMIC ANALYSIS METHODS OF UNDERGROUND TUNNEL ENGINEERING |
Han Xiqin 1,2) ; and Xu Xueyong 1,2) |
1) Institute of Seismology, China Earthquake Administration, Wuhan 4300712) Wuhan Institute of Earthquake Engineering, Wuhan 430071 |
Received: 1900-01-01 Revised: 1900-01-01 Online: null |
Supporting info null |
|
|