|
2015, Vol. 35(2): 235-238 DOI: 10.14075/j.jgg.2015.02.015 | ||
An Improved Two-Step M Estimation Method Based on the Danish Method | ||
1〓Guangxi Scientific Experiment Center of Mining, Metallurgy and Environment, 12 Jiangan Road,Guilin 541004, China 2〓College of Geomatic Engineering and Geoinformatics, Guilin University of Technology, 12 Jiangan Road ,Guilin 541004, China 3〓Guangxi Key Laboratory of Spatial Information and Geomatics, 12 Jiangan Road ,Guilin 541004, China |
||
Received 2014-03-19 Revised null | ||
Supporting info | ||
|